Mine Planning and Equipment Selection SpringerLink

Introduction. This edited volume includes all papers presented at the 22nd International Conference on Mine Planning and Equipment Selection (MPES), Dresden, Germany, 2013. Mineral Resources are needed for almost all processes of modern life, whilst the mining industry is facing strict requirements regarding efficiency and sustainability.

Get Price

AND EQUIPMENT SELECTION/SAO PAULO/BRAZIL/22-25

2008-2-15  7 Planning and equipment selection for difficult mining conditions Case study regarding ensuring mine workings stability under the difficult conditions 313 of the Jiu Valley, Romania V.Arad, SArad, I.Andras LRadermacher Planning and equipment selection in some lignite deposits in Rajasthan State India 319 R.Choudhuri P.K.Deb

Get Price

Models for Mining Equipment Selection - MSSANZ

2013-1-15  This paper addresses equipment selection for surface mines. Given a mine plan, the ultimate objective is to select the trucks and loaders such that the overall cost of materials handling is minimised. Such a fleet must be robust enough to cope with the dynamic nature of mining operations where the production schedule can sometimes be dependent on refinery requirements and demand. Due to the scale of operations in mining, even a small improvement in operation efficiency translates to substantial savings over the life of the mine.

Get Price

Mine Planning and Equipment Selection 2004:

Mine Planning and Equipment Selection 2004: Proceedings of the Thirteenth International Symposium on Mine Planning and Equipment Selection, Wroclaw, Poland, 1-3 September 2004

Get Price

Equipment Selection for Surface Mining: A Review

2013-7-19  Burt and Caccetta: Equipment Selection 2 Period 2 Period 3 dumpsite benches are formed Period 1 Figure 1 A mining schedule is divided into planning periods. In each period, the mine planning decisions include which material will be excavated, and where the excavating equipment

Get Price

Equipment selection.pdf - Equipment selection From The ...

Equipment selection From QueensMineDesignWiki The equipment selection process for an underground mine design plan has an extremely wide scope as there are a myriad of parameters to consider when incorporating mobile and stationary equipment in hard or soft rock mining applications. This article primarily focuses on the initial selection of mobile equipment in hard rock mining operations.

Get Price

Mining operations and mobile equipment selection audit

2021-9-6  Mining operations and mobile equipment selection audit - guide Page 4 of 22 1 Selection of equipment Selection of equipment Point Standard Guideline 1.1 The mobile equipment is selected according to the limitations imposed by the site operating conditions. Intent: To ensure that new mobile equipment will be compatible with the site conditions.

Get Price

TPM framework for underground mobile mining

2016-10-3  Almaty, October 12-14, 2011 MINE PLANNING EQUIPMENT SELECTION 870 2.1.1 Maintenance workshop and storage Currently, the mine has about 50 mobile equipment units, including drill rigs, LHDs, scaling machines, charging trucks, etc. There are three types of workshops in the mine.

Get Price

GUIDELINES FOR THE INTEGRATED PLANNING AND

2021-1-22  Mine planning and design is an iterative and continuous process which starts at the conceptual stages of a new mining project, when the need for such a mining venture has been identified, and is only completed at the end of the mine’s life when successful mine

Get Price

Selection of practical bench height in open pit mining ...

2015-9-9  Selection of practical bench height in open pit mining using a multi-criteria decision making solution Hossein Soltanmohammadi1*, Morteza Osanloo, Ali Sami2 and Shahnam Behnam Malekzadeh1 Department of Mining Engineering, Aryakanyar Consulting Engineers (AKCE), Amirkabir University of Technology, Tehran, Iran.

Get Price

TPM framework for underground mobile mining

2016-10-3  Almaty, October 12-14, 2011 MINE PLANNING EQUIPMENT SELECTION 870 2.1.1 Maintenance workshop and storage Currently, the mine has about 50 mobile equipment units, including drill rigs, LHDs, scaling machines, charging trucks, etc. There are three types of workshops in the mine.

Get Price

Equipment selection.pdf - Equipment selection From The ...

Equipment selection From QueensMineDesignWiki The equipment selection process for an underground mine design plan has an extremely wide scope as there are a myriad of parameters to consider when incorporating mobile and stationary equipment in hard or soft rock mining applications. This article primarily focuses on the initial selection of mobile equipment in hard rock mining operations.

Get Price

Christina Burt and Yao-ban Chan MASCOS/The

2009-9-27  Equipment selection for surface mines C. Burt and Y. Chan. Surface mining Industry Modelling Objective function Constraints Implementation Extensions Operating cost We denote the cost of operating equipment of type e in period k at age bracket l

Get Price

Mine Planning and Equipment Selection 1998 - 1st Edition ...

1998-1-1  This work details the findings of the 7th International Conference on Mine Planning and Equipment Selection of 1998, held in Calgary. Topics include: design and planning of surface and underground mines; geotechnical stability in surface and underground mines; and mining

Get Price

Short-Term Planning for Open Pit Mines: A Review

2019-8-8  multiple horizons (from day-to-day decision-making, to mine design and long-term planning).We restrict our attention to the short-term planning of open-pit mines, with horizons of at least one week to at most one to two years. Research related to shift-to-shift or day-to-day planning, equipment selection (selecting

Get Price

OPEN PIT MINE PLANNING: ANALYSIS AND SYSTEM

2020-2-3  planning system, and contrast this with the unconventional mine planning system used by oil sands mines. Systems activity models of both the conventional and unconventional systems are developed in support of documenting and contrasting the two systems. Constraints unique to oil sands mine planning are identified and their impact on the oil sands

Get Price

GEOTECHNICAL CONSIDERATIONS IN OPEN PIT MINES

2021-9-6  Mine planning deals with the correct selection and coordinated operation of all the sub -systems, eg. mine production capacity, workforce numbers, equipment selection, budgeting, scheduling and rehabilitation. Mine design is the appropriate engineering design of all the sub-systems in the overall mine structure, e.g. production and near-wall ...

Get Price

Modern Strategic Mine Planning - Inside Mines

2008-8-25  For instance, suppose that a truly optimized mine plan would generate $1,000 million in value. The actual mine plan may generate $800 million in value, and yet be measured to generate $1,500 million in value because the value measurement is incorrect. Modern strategic mine planning, a new research initiative at the Colorado School

Get Price

Selection of practical bench height in open pit mining ...

2015-9-9  Selection of practical bench height in open pit mining using a multi-criteria decision making solution Hossein Soltanmohammadi1*, Morteza Osanloo, Ali Sami2 and Shahnam Behnam Malekzadeh1 Department of Mining Engineering, Aryakanyar Consulting Engineers (AKCE), Amirkabir University of Technology, Tehran, Iran.

Get Price

Hard Rock Miner's Handbook

2019-5-15  Mining industry response to the book continues to be incredible. Thanks in large part to the efforts by John Chadwick of the Mining Journal, infomine, and many other members of the mining community, the Hard Rock Miner’s Handbook has been distributed to over 113 countries worldwide. Web hits and downloads continue as students and

Get Price

Modern Strategic Mine Planning - Inside Mines

2008-8-25  For instance, suppose that a truly optimized mine plan would generate $1,000 million in value. The actual mine plan may generate $800 million in value, and yet be measured to generate $1,500 million in value because the value measurement is incorrect. Modern strategic mine planning, a new research initiative at the Colorado School

Get Price

CHAPTER 11 Mining Technology - Princeton University

2007-3-19  Principal considerations in the selection of surface mining and reclamation techniques and equipment include the thickness and character of the overburden, the dip of the seam, the thickness and number of recov-erable seams, and the physical and chemical

Get Price

Surface Mining Transportation Systems - EOLSS

2020-8-25  Surface Mining Equipment, 455 pp. Martin Consultants Inc. Golden, CO, USA [This book is published as a manual for equipment selection. However, it provides and excellent review on various transportation equipments including truck, bulldozer, loader

Get Price

Access Optimisation Tools in Underground Mine Design

2013-2-11  the underground mine planning problem. In an open-cut mine, once the pit has been determined, everything within the pit shell is removed, and is either sent to the mill or discarded as waste. In an underground mine, the selection of ore versus waste must be made earlier in the planning stages, and is closely tied to the selection of cut-off ...

Get Price

1.1 PHASES OF A MINING PROJECT - Home ELAW

2019-2-4  begin to plan for the development of the mine. This phase of the mining project has several distinct components. 1.1.2.1 Construction of access roads The construction of access roads, either to provide heavy equipment and supplies to the mine site or to ship out processed metals and ores, can have substantial environmental impacts,

Get Price

INVESTIGATION AND DESIGN - British Columbia

2015-7-24  Investigation design of mine dumps . Includes bibliographical references: p. ISBN 0-7718-9118-0. 1. Coal mines and m1n1ng - waste disposal - British Columbia. 2. coal mines and mining - waste disposal - Environmental aspects - British Columbia. 3. Mineral industries - waste disposal - British Columbia. 4. Mineral industries - waste disposal ­

Get Price

UNDERGROUND MINE VENTILATION SURVEY

2016-3-16  5.3 Equipment’s required for pressure quantity survey 20 5.4 Flowchart for conducting ventilation survey 26 5.5 Ventilation plan 26 5.6 Selection of measurement stations for pressure quantity survey 29 5.7 Procedure for conducting pressure survey by gauge-tube 29 5.8 Measurement of cross-sectional area 30 5.9 Traversing methods 31

Get Price

MINIMUM ENGINEERING STUDY REQUIREMENT -

2020-1-22  Detailed geologic and mine engineering work has been conducted to define a resource and reserve. Detailed test work has been completed to develop all mining and processing parameters for pit slope design, hydrology, geotechnical, flow sheet development, equipment selection and sizing, consumables and power consumption, material balance, general

Get Price

Hard Rock Miner's Handbook

2019-5-15  Mining industry response to the book continues to be incredible. Thanks in large part to the efforts by John Chadwick of the Mining Journal, infomine, and many other members of the mining community, the Hard Rock Miner’s Handbook has been distributed to over 113 countries worldwide. Web hits and downloads continue as students and

Get Price

CHAPTER 1 MATERIALS HANDLING SYSTEM DESIGN

2020-2-25  6 Materials Handling System Design Figure 1.3 Honeycombing loss number of storage spaces that are next closest to the I/O point, and so on. Figure 1.4 shows an interactive playspace in the “Ten principles of Mate- rials Handling” CD that allows a learner to understand the fundamental

Get Price